The crane arrives as nine separate pieces, these are:
- Legs x4 (numbered 1 - 4)
- Leg joints x2
- Beam x2 (numbered 5&6)
- beam joint x1
- Standard Bolts (with nuts) x8
It is recommended that you first insert the numbered legs into their corresponding numbered slots in the leg joints and secure them in place using the standard bolts provided. Each leg has multiple bolt holes so the length can be altered dependent on the ground clearance needed and the terrain upon which the crane is placed. Next, insert the beams into their corresponding numbered slots also in the leg assemblies and again fix into place using the standard bolts provided. Finally, ensure the cradle and pulley system has been inserted over one half of the beam and then proceed to fix both sides of the crane into the central beam support, finally securing using the last two standard bolts.
This assembly is very quick and efficient, even the materials used allow it to be assembled by two or three people safely.
No comments:
Post a Comment